Skip to content

Welcome to ResidentialBusiness.com — your guide to building a thriving home-based business

Your entrepreneurial journey starts here

Build the business you've
always known you could.

Home-based. Remote. Independent. Whatever your model — this community exists to help you go from idea to income with real support, real conversations, and real momentum.

15+
Years running
10K+
Members strong
6
Active topic hubs
Free
To join forever

"In today's dynamic world, entrepreneurship has become a gateway to financial independence — and launching a home-based business is one of the most accessible paths to get there."

It offers the freedom to be your own boss, control your schedule, and shape your financial future on your terms. This community is your starting point — designed to spark your entrepreneurial mindset and equip you with the core principles to transform an idea into a thriving business. Whether you're fueled by passion, a groundbreaking product, or a smart solution to a common problem, success begins with aligning your vision to real market demand, researching your audience, and laying the foundation with a solid business plan.

Working from home unlocks advantages like flexibility, minimal overhead, and the chance to create a work-life balance that fits your lifestyle — but it requires discipline, structure, and smart time management. Carve out a dedicated workspace, implement efficient routines, and harness the power of technology to automate tasks and stay connected with clients.

With the right mindset, strategic planning, and a willingness to learn and adapt, you can turn your home into a hub of innovation and income. This is more than just a resource — it's a call to action. Take control of your future and build a business that reflects your passion, purpose, and potential.


Explorer membership is free forever. Paid plans unlock the full platform — no ads, no limits.

These trains could carry giant batteries across Colorado and deliver clean energy to Denver

Featured Replies

rssImage-9f0fc061b487141187dec7573fc8e046.webp

Across the U.S., dozens of proposed solar, wind, and battery projects—encompassing thousands of gigawatts of potential power—are backlogged as they wait to be allowed to plug into the power grid. And, even in areas where renewable energy projects are already online, their output is often heavily curtailed. This clean energy bottleneck stems from the fact that, as demand for renewable energy rises, the U.S. isn’t building new transmission lines fast enough to transport large amounts of clean energy from point A to point B. 

Now, there’s a company looking to address that problem with a simple yet radical solution: Putting renewable energy into giant batteries and transporting those batteries by train.

SunTrain is a San Francisco-based company founded by green energy developer Christopher Smith, who now serves as the company’s president and chief technology officer. The idea, he explains, is to use the existing U.S. freight train system—which covers around 140,000 miles of terrain—to bring renewable energy that’s being curtailed by transmission bottlenecks to the areas that need it most.

SunTrain is currently working on a pilot project that would run between Pueblo, Colorado, and Denver. If it’s approved by regulators, Smith says, he expects the pilot could be off the ground in just two years.

06-91293078-train-transport-and-renewabl[Photo: SunTrain]

Current challenges to transporting renewables

Clean energy is the fastest-growing source of electricity in the U.S. According to a report from American Clean power, 93% of the new energy capacity last year was solar, wind, and battery storage. The issue, Smith says, is that transmission line infrastructure lags far behind the rate of clean energy growth.

“The United States needs 300,000 miles of new transmission lines, like, right now. That’s the amount that we need immediately to keep up with current demand,” Smith says. “It’s also estimated that, to reach 100% renewables, as well as the electrification demand that we’ll have by 2050, we’ll need over a million miles of new transmission lines by 2050. Currently, we’re building less than 1,000 miles a year.”

02-91293078-train-transport-and-renewabl[Image: SunTrain]

Building new transmission lines is challenging for a number of reasons, including environmental regulations, the time it takes, and the fact that any new lines would have to cross thousands of miles of privately owned land. 

In Colorado, for example, Smith says there’s a lot of renewable energy in the state’s southeast corner, which flows through the grid to Pueblo. However, because there’s not enough transmission line capacity between Pueblo and Denver, much of that power can’t ultimately be used.

“Once that renewable energy gets to Pueblo, there’s not enough transmission line capacity to get it into downtown Denver,” Smith says. “So that energy basically gets curtailed—a fancy word for being wasted.”

Until now, the costly construction of new transmission lines has been the main solution that’s available. But Smith says this discussion overlooks a resource that’s been used to transport energy for almost 200 years: railroads.

“The freight railroad network already moves virtually every single form of energy known to man that’s used in a real way: natural gas, coal, oil, ethanol, biomass, spent nuclear waste, various fossil fuels, and the list goes on and on,” Smith says. “So there’s this huge amount of overlap of our great railroad network and our electrical systems already. There is no reason why we cannot be moving battery trains over the freight rail network like we move every other form of energy.”

03-91293078-train-transport-and-renewabl[Photo: SunTrain]

SunTrain’s solution

For its pilot project, SunTrain is partnering with Xcel Energy, Colorado’s largest electric utility. Xcel owns a coal plant in Pueblo (Comanche Generating Station) and a natural gas plant in Denver (Cherokee Generating Station) that are both set to be decommissioned within the next several years. Through a collaboration with SunTrain, these plants could potentially be re-powered with battery stored energy. 

Smith says SunTrain would use the existing substation inside Comanche Generating Station—which already has extensive railroad infrastructure from its history as a coal plant—to charge its batteries from Pueblo’s bottlenecked grid. During the day, Smith says, the energy will likely be 100% renewable. Then, the batteries would be transported to Denver and the energy offloaded at the Cherokee Generating Station onto Denver’s grid. (Charging and discharging take between four and six hours each, and the 139-mile trip from Pueblo to Denver takes about five hours by train.)

“A substation can turn energy into a format that can cover long distances without losing much energy,” Smith says. “A substation can also turn electricity generated from a power plant into a format that can be used by local homes and businesses. For SunTrain’s purposes, the Pueblo substation allows us to get the electricity formatted properly for our batteries while also collectively accessing all the various renewable energy generators in the region.”

07-91293078-train-transport-and-renewabl[Photo: SunTrain]

SunTrain’s proposed railcars will be made of 20-foot shipping containers, each of which will hold about 40 tons of batteries. The company designed proprietary charging and discharging systems that “allow the energy to flow right from where it’s generated, whether it’s a solar array or a substation, right under the batteries on the railcar,” Smith says. Then, once the train arrives at its destination, the discharging system would similarly allow the energy to flow right off the batteries. The whole process is designed so that the batteries never actually need to be removed from the train.

05-91293078-train-transport-and-renewabl[Image: SunTrain]

In an interview with the podcast In the Noco, Smith said SunTrain’s first generation railcars are designed to match the freight railroad’s existing standards for coal trains, to ensure that the system itself doesn’t need to change anything in order for SunTrain to come to market. Based on those parameters, each train will be built at between 8,000 and 9,000 feet long, with the capacity to carry around two gigawatt hours of power in total. That’s enough to power a city of 100,000 for a full day.

Smith says the team has already tested a proof-of-concept train on several trips amounting to more than 10,000 miles on the Union Pacific network, traveling from SunTrain’s San Francisco testbed to discharge locations across California, Nevada, and Colorado. Now, the company is waiting for Colorado’s Public Utilities Commission to approve Xcel’s expenditure of about $125 million to begin construction on the pilot project.

“We tested the technology, the feasibility, made sure the mechanical standards were there,” Smith says. “Our manufacturing partners can deliver entire unit trains of these—meaning 200 rail cars of batteries that could carry about 1.75 gigawatt hours of energy. So this isn’t something that’s far away, coming in the pipeline, or needing some kind of technological breakthrough. This is an immediately executable idea. It just needs the capital.”

View the full article

Join ResidentialBusiness.com as a free Explorer member to access the community

Advertisement

ResidentialBusiness.com — Free to join

You're reading as a guest.
Explorers actually participate.

Create your free Explorer account in seconds — no credit card, no commitment. Get instant access to post, reply, and connect inside one of the longest-running home business communities on the web.


Post topics & reply to discussions
Access the Community Business Lounge
Connect with remote & home-based founders
Build your member profile & reputation

The Community Business Lounge is where real conversations happen — business models, income strategies, remote work, and what's actually working right now. Guests read. Explorers contribute. The difference is one free signup.

Already growing and want more? Our Builder, Vanguard, and Pro Visionary plans remove ads entirely and unlock the full platform — but Explorer is the right place to start.

Free forever. No card required. Upgrade only when you're ready.

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.